2 Attachment(s)
In the case of fucks being given, here's what i ended up with:
"T" off the vacuum rails, another "T" prior to the reservoir w/ check valve for booster going to FPR. Talked it over with Ludwig, and the MAP is onboard the Haltech, and will only be used for barometric correction, so no line needed to be run. https://www.miataturbo.net/attachmen...ine=1362514509 https://www.miataturbo.net/attachmen...ine=1362514509 |
All times are GMT -4. The time now is 11:40 PM. |
© 2024 MH Sub I, LLC dba Internet Brands