Making chips!
|
Originally Posted by skou
(Post 1163339)
Making chips!
|
Seriously why don't you buy a laser printer, make a casting of these parts in plastic, contact a chinese supplier and reproduce them in large quantities. Seriously I just gave you an insight as to how is done and you can make great profit on these beautiful pieces.
You have great product in your hands. |
Seriously! lol
I look forward to pics! |
2 Attachment(s)
|
Oh My..... :')
|
Ian needs a break now... haha!
|
Originally Posted by StealthNB
(Post 1163506)
Seriously why don't you buy a laser printer, make a casting of these parts in plastic, contact a chinese supplier and reproduce them in large quantities. Seriously I just gave you an insight as to how is done and you can make great profit on these beautiful pieces.
You have great product in your hands. |
4 Attachment(s)
Thermostat housings are done...
https://www.miataturbo.net/attachmen...1&d=1410204657 https://www.miataturbo.net/attachmen...1&d=1410204657 |
Originally Posted by skou
(Post 1165197)
Thermostat housings are done...
|
What is the width and depth of the groove machined into the spacer for the thermostat?
EDIT: Nevermind, didn't search hard enough |
I check this section hourly for more CNC p0rn...
|
Sorry guys. The latest excuse I'm getting is that two out of three machining centers are down for repairs!
|
2 Attachment(s)
Spacers...done!
Don't worry about the AN6 ORB fitting in the M12x1.5 sensor port. I have been assured they didn't try to thread it in. https://www.miataturbo.net/attachmen...1&d=1411269837 |
I was just thinking about this. Thanks for the update. I love this stuff.
|
Great Work man,. You have to groove the spacer in order for the T-stat to sit as flat as possible. For reference look at the rear of any miata cylinder head.
|
Originally Posted by StealthNB
(Post 1168941)
Great Work man,. You have to groove the spacer in order for the T-stat to sit as flat as possible. For reference look at the rear of any miata cylinder head.
|
Looking good! I am not using a T-Stat, so they can leave the groove out if possible!
|
Parts are done! Picking them up in the morning. Hope to have everything sorted, packed and in the mail tomorrow.
|
14 Attachment(s)
So, I pick up the parts and when I go to test fit everything, I find this...
https://www.miataturbo.net/attachmen...1&d=1411676082 They forgot to tap the AN16 ORB port on the water pump inlets! :facepalm: It'll now take another day for them to finish. Anyhow, the rest of the parts look great and fit perfectly. https://www.miataturbo.net/attachmen...1&d=1411676082 https://www.miataturbo.net/attachmen...1&d=1411676082 https://www.miataturbo.net/attachmen...1&d=1411676082 https://www.miataturbo.net/attachmen...1&d=1411676082 https://www.miataturbo.net/attachmen...1&d=1411676082 https://www.miataturbo.net/attachmen...1&d=1411676082 |
All times are GMT -4. The time now is 12:13 PM. |
© 2024 MH Sub I, LLC dba Internet Brands