oil cooler/oil filter relocation kits, group buy?
#82
Junior Member
Thread Starter
iTrader: (12)
Join Date: Sep 2008
Location: Inland Empire So-Cal
Posts: 274
Total Cats: 0
any word here yet? Thompson has started the run of his kits, for delivery end of November-ish.
Any progress on the crappy CNC guy replacement issue?
I kinda preferred this kit for horizontal filter mount, and sensor taps on the engine block adapter part, but if its not going to happen Thompson makes a pretty nice kit as well.
Any progress on the crappy CNC guy replacement issue?
I kinda preferred this kit for horizontal filter mount, and sensor taps on the engine block adapter part, but if its not going to happen Thompson makes a pretty nice kit as well.
so i'll know something by thurday (i hope)
seriously guys, i never knew having **** made was so ******* difficult... but i'm making progress,
#86
Junior Member
Thread Starter
iTrader: (12)
Join Date: Sep 2008
Location: Inland Empire So-Cal
Posts: 274
Total Cats: 0
if there is an interest i can do a stainless line option as well...
#90
Junior Member
Thread Starter
iTrader: (12)
Join Date: Sep 2008
Location: Inland Empire So-Cal
Posts: 274
Total Cats: 0
all other kits will come with -8 hose....
also, with stainless, it comes with the special fittings that screw on and lock the line in place...
if you want stainless we can do that, but it will cost more... all our kits will come with the hose as listed, unless a special request comes in... but since we will not be ordering stainless lines and such in bulk, it will cost more...
#92
Junior Member
Thread Starter
iTrader: (12)
Join Date: Sep 2008
Location: Inland Empire So-Cal
Posts: 274
Total Cats: 0
hey all, got some good news in.... (no price yet)
we should have prices by next tuesday if everything goes according to plan...
we talked to the cnc guy yesterday, and he thinks he can match the price point we are looking for....
he has to check with his suppliers and figure everything out, we set up an appointment for next tues...
so hopefully, i will have all the prices listed up tuesday night....
again... like i said....
I HAVE A **** LOAD OF MY OWN MONEY TIED UP IN THIS... WE HAVE TO PAY PREMIUM FOR THE PROTOTYPES, WE HAVE TO ORDER **** LOADS OF EVERYTHING...
I WANT TO START MOVING THIS **** SO I CAN GET MY MONEY BACK...
I AM AS ANXIOUS IF NOT MORE THAN EVERYONE ELSE TRYING TO GET THIS **** MOVING....
BUT AS IT STANDS RIGHT NOW... WE ARE GETTING EVERY PIECE FROM A DIFFERENT SUPPLIER, SO IT HAS BEEN A LOGISTICAL NIGHTMARE!!!
-JAMES
we should have prices by next tuesday if everything goes according to plan...
we talked to the cnc guy yesterday, and he thinks he can match the price point we are looking for....
he has to check with his suppliers and figure everything out, we set up an appointment for next tues...
so hopefully, i will have all the prices listed up tuesday night....
again... like i said....
I HAVE A **** LOAD OF MY OWN MONEY TIED UP IN THIS... WE HAVE TO PAY PREMIUM FOR THE PROTOTYPES, WE HAVE TO ORDER **** LOADS OF EVERYTHING...
I WANT TO START MOVING THIS **** SO I CAN GET MY MONEY BACK...
I AM AS ANXIOUS IF NOT MORE THAN EVERYONE ELSE TRYING TO GET THIS **** MOVING....
BUT AS IT STANDS RIGHT NOW... WE ARE GETTING EVERY PIECE FROM A DIFFERENT SUPPLIER, SO IT HAS BEEN A LOGISTICAL NIGHTMARE!!!
-JAMES
Thread
Thread Starter
Forum
Replies
Last Post