Boundary Engineering and WeaponX Coil On Plug PNP Pre-Order List
#141
#143
Elite Member
Thread Starter
iTrader: (9)
Join Date: Jun 2008
Location: Houston, TX
Posts: 1,547
Total Cats: 13
No updates on approximate ship dates. Just keep checking your email. we do send out tracking information. We have units done, and in the field we are working the list as quickly as possible. If anyone is running a Megasquirt or Adaptronic please let me know, those are quick to assemble compared to the stock units because there isn't nearly as much soldering.
Last edited by TravisR; 09-01-2009 at 11:00 PM.
#144
"LOL. You guys are incorrigible. If it were me, I'd refund your money just to get you all to stop bitching."
Jesus Christ / Mohammed guys...this was a group buy / ramp up production for the benefit of all...MTnet included. Not a production run for ***** sake...sorry, no affilation, etc.
Jesus Christ / Mohammed guys...this was a group buy / ramp up production for the benefit of all...MTnet included. Not a production run for ***** sake...sorry, no affilation, etc.
#145
Each kit once it gets to us takes about 5 hours to do, and there is at least a 24hour drying time for the epoxy. That's why things are moving slow. We get a unit done, then we pot it. We might be getting 1 to 1.5 done per a work day where we can sit for 5 hours at a time. We estimated an hour to an hour and 45 minutes for each one.
If anyone is running a Megasquirt or Adaptronic please let me know, those are quick to assemble compared to the stock units because there isn't nearly as much soldering.
Keep it up. Yes, I've had my coffee today
#146
#150
Can anyone confirm that they have received their order and successfully installed?
Travis, your description of this device says it will work on any ECU, is that entirely correct? Have you tested on the Link?
Travis, your description of this device says it will work on any ECU, is that entirely correct? Have you tested on the Link?
#151
Elite Member
Thread Starter
iTrader: (9)
Join Date: Jun 2008
Location: Houston, TX
Posts: 1,547
Total Cats: 13
You have to keep in mind, that of the orders that were put in, most of the people are running power cards and are supercharged. Some how this got onto a supercharged forum and they went bonanza over the systems. There is actually only a pretty small amount from Miata turbo that have ordered.
There is only one ECU we've had problems with and thats the Hydra. The first orders that went out were for standalones (because as stated they are quick to build) that produced a 5v pulse signal. The Hydra for some reason was not putting out this 5v pulse, so i suspect it is using the stock voltage instead. In that case the hydra just needs a system with the amplifiers that we build into the universal boards. I have not tested that yet on a customer car but intend to do so this week. It is highly highly unlikely that the hydra is sending out any other signal then this, because if it was the stock coils would not function properly.
My exploits into the stock ecu using an o-scope have revealed so many things that people have not been catching. I would never never never run a COP on this car without an advanced digital ignition management unit and an oscilloscope. You will burn out coils. The signals output by the ECU are a precise mess.
#152
#154
#155
Where am I on the list? Shipped or when?
#156
Elite Member
Thread Starter
iTrader: (9)
Join Date: Jun 2008
Location: Houston, TX
Posts: 1,547
Total Cats: 13
Water line bursted, and have been putting a new one in. I will have more details after I finish tonight. Ofcourse refunds are open to anyone who is frustrated with the process. I wanted to make sure everyone knew that. These parts are also backed by a 100% unconditional gauruntee to work for 1 year. I feel thats important to state as well since this is a new part. Even though we've had all the brass sign off on it, you can't tell until the end user really beats on it.
#158
Elite Member
Thread Starter
iTrader: (9)
Join Date: Jun 2008
Location: Houston, TX
Posts: 1,547
Total Cats: 13
Alright, I got it most of the way buried anyways. Yikes what a pain.
So right now the plan is to have all back orders caught up in the next month. Here is what I do know. The current manufacturing is two slow. We can't keep this up, and get every order filled. I have new orders that come in daily despite me telling people its going to be a month+, and although it doesn't matter to you guys who are much much higher up in line, I have to switch to another manufacturing service that doesn't consist of me doing the wiring looms, and the aerospace tech doing the PCB boards/potting. I have to tend to standalone orders, my regular work, and these wiring looms and that is just ending up letting everyone down. Clearly not a valid solution.
So what I would ask is to have everyone hang tight while I work something out that will end up getting the parts out faster. I'm tired of disappointing people, and I've got to get this fixed now so I don't continue to do so. As I have stated before refunds are available if you feel this is an unfair wait. The wait itself I'm hoping will be a steady delay while I sort and get samples from large scale PCB manufacturers, and then once a manufacturer is selected everyone will get there parts just like we previously hoped would happen with just Alex and I doing them exept they will have 25 workers who have nothing to do but putting these boxes together, and solid experience to do it quickly.
I will update as I know more.
So right now the plan is to have all back orders caught up in the next month. Here is what I do know. The current manufacturing is two slow. We can't keep this up, and get every order filled. I have new orders that come in daily despite me telling people its going to be a month+, and although it doesn't matter to you guys who are much much higher up in line, I have to switch to another manufacturing service that doesn't consist of me doing the wiring looms, and the aerospace tech doing the PCB boards/potting. I have to tend to standalone orders, my regular work, and these wiring looms and that is just ending up letting everyone down. Clearly not a valid solution.
So what I would ask is to have everyone hang tight while I work something out that will end up getting the parts out faster. I'm tired of disappointing people, and I've got to get this fixed now so I don't continue to do so. As I have stated before refunds are available if you feel this is an unfair wait. The wait itself I'm hoping will be a steady delay while I sort and get samples from large scale PCB manufacturers, and then once a manufacturer is selected everyone will get there parts just like we previously hoped would happen with just Alex and I doing them exept they will have 25 workers who have nothing to do but putting these boxes together, and solid experience to do it quickly.
I will update as I know more.
#160
Five days Travis, what's your status? Have put names on the tasks in the process yet? How many of these units do you need to get out yet?