Half Bottle of JD and a 12mm wrench
#181
Your design helped make this, so I thought I'd return the favor.
You just have to know where to look
http://www.globaltecheng.com/product...=0&VS3=0&VS6=0
You just have to know where to look
http://www.globaltecheng.com/product...=0&VS3=0&VS6=0
#188
Elite Member
Thread Starter
iTrader: (8)
Join Date: Dec 2008
Location: Kingston, Ontario
Posts: 2,910
Total Cats: 51
I have a dyno coming to my shop for a day on May 1. So i NEED to have the car done by then!
basically all i need is intake manifold, charge piping and a downpipe to do though. as well as wiring the new sensors into the AEM for the VVT swap.
I am also having the tuner do my S14 with s14SR, power FC and n60 maf... new daily... which im hoping to make ~260-270 out of.
#189
Elite Member
Thread Starter
iTrader: (8)
Join Date: Dec 2008
Location: Kingston, Ontario
Posts: 2,910
Total Cats: 51
Your design helped make this, so I thought I'd return the favor.
You just have to know where to look
http://www.globaltecheng.com/product...=0&VS3=0&VS6=0
You just have to know where to look
http://www.globaltecheng.com/product...=0&VS3=0&VS6=0
Thanks for the link, but im going to try to find a supplier like that in canada to save on shipping. If not, i will use this.
#193
Elite Member
Thread Starter
iTrader: (8)
Join Date: Dec 2008
Location: Kingston, Ontario
Posts: 2,910
Total Cats: 51
not sideways driver... daily i cant blow it up ahah.
needs kouki spoiler.
miata will still slide and when i upgrade brakes i hope to do some solo 1, time attack wtv its called.
needs kouki spoiler.
miata will still slide and when i upgrade brakes i hope to do some solo 1, time attack wtv its called.
#195
Elite Member
Thread Starter
iTrader: (8)
Join Date: Dec 2008
Location: Kingston, Ontario
Posts: 2,910
Total Cats: 51
I have the week off, so im going to get some stainless for my intercooler mount that will double as a splitter and ducting mount (wait for pure ballerness) as well as some wire so i can do the VVT wiring into the AEM box.
-New flanges will be in for the downpipe and screamer pipe so i can finish those off Thursday.
-Intercooler piping should be in later this week, i will be able to complete the hot pipe for now.
-Ross parts and head flange have cleared customs and i hope are in for this week so i can get a solid start on that.
Super Excite!!!
-New flanges will be in for the downpipe and screamer pipe so i can finish those off Thursday.
-Intercooler piping should be in later this week, i will be able to complete the hot pipe for now.
-Ross parts and head flange have cleared customs and i hope are in for this week so i can get a solid start on that.
Super Excite!!!
#196
Elite Member
Thread Starter
iTrader: (8)
Join Date: Dec 2008
Location: Kingston, Ontario
Posts: 2,910
Total Cats: 51
Parts I picked up today!
-4x ross machine velocity stacks
-4' ross machine runner material
-tial vband outlet for the turbo and wastegate
-3x o2 sensor bungs
-vband for the exhaust
-aluminum plate for the throttle body mount
-4x ross machine velocity stacks
-4' ross machine runner material
-tial vband outlet for the turbo and wastegate
-3x o2 sensor bungs
-vband for the exhaust
-aluminum plate for the throttle body mount